← Back to map

Turner Meadow Solar StationPlanned

Androscoggin County, Maine · EIA plant ID 65709 · Operator: turner meadow solar station, llc
SolarISONEBA: ISNE

20 MW planned (Solar Photovoltaic), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TRNRSolar PhotovoltaicPV19.819.8planned Dec 2028Planned—coming soon

Owner / operator

Operator: turner meadow solar station, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Turner CSG LLC1 MW5.4 km
Gulf Island19 MW10.2 km
Merrill Road Solar5 MW10.4 km
Deer Rips7 MW12.2 km
Androscoggin 3retired12.2 km
Dynamic - Leeds Solar (CSG)5 MW14.8 km