← Back to map

Nebula Solar

Cameron County, Texas · EIA plant ID 65661 · Operator: rayos del sol solar project, llc
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate135MWSummer 135 MW
Generators1in service
Net generation304GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202725.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022144.420.8%—
2023284.124.0%—
2024254.421.5%—
2025291.324.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NEB1Solar PhotovoltaicPV135135Jun 2022Operating—coming soon

Owner / operator

Operator: rayos del sol solar project, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
rayos del sol solar project, llc100.0%135 MW

Nearby plants

Within 80 km.
Vancourt Solar Interconnections45 MW0 km
Mesquite Clean Energy Center (BESS)10 MW2.6 km
BESS La Feria10 MW3.3 km
Accalia Point Solar, LLC—4 km
SMT Harlingen II LLC10 MW12.4 km
Citrus Flatts Energy Center, LLC100 MW15.1 km