← Back to map

SR Greenville I

Greene County, Tennessee · EIA plant ID 65638 · Operator: sr greenville i
SolarSolar PhotovoltaicBA: TVA
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.7511.25GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202624.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.25.9%—
202310.324.5%—
20241023.7%—
202510.124.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SRGN1Solar PhotovoltaicPV4.84.8Dec 2022Operating—coming soon

Owner / operator

Operator: sr greenville i. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
sr greenville i100.0%5 MW

Nearby plants

Within 80 km.
SR Washington I, LLC9 MW10.7 km
SR Greenville II5 MW12.2 km
SR Jonesborough4 MW16.6 km
SR Albany, LLC4 MW19.7 km
John Sevier997 MW25.4 km
SR Gray6 MW25.8 km