George M Sullivan Generation Plant 2

Anchorage County, Alaska · EIA plant ID 6559 · Operator: Chugach Electric Assn Inc
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion Turbine
Nameplate347MWSummer 309 MW
Generators5in service
Net generation1,772GWh12 mo to Dec 2025
Capacity factor65%gas/coal/oil units, summer MW
Heat rate7,521Btu/kWhfossil units, electric fuel, HHV
First online1979Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202565.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,000200520102015202020257,521 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001806.6——
2002739.5——
2003812.842.2%10,994
20041,002.351.9%10,998
2005964.550.1%11,143
20061,280.966.5%10,963
20071,193.462.0%10,898
20081,149.559.5%10,353
20091,004.752.2%10,868
20101,048.454.4%10,638
20111,082.456.2%10,700
20121,007.152.1%11,140
2013562.325.9%11,057
2014493.722.7%11,432
2015654.130.1%10,386
2016589.727.7%11,038
2017803.830.8%9,037
2018843.331.1%8,391
2019626.223.1%8,670
2020447.516.5%8,970
2021761.428.1%7,787
2022908.633.5%8,287
2023911.333.6%8,286
2024923.334.0%7,765
20251,771.665.4%7,521

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas74
Net summer MW on oil74
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10Natural Gas Fired Combined CycleCT60.450Feb 2017Operating—coming soon
11Natural Gas Fired Combined CycleCA30.929Feb 2017Operating—coming soon
7Natural Gas Fired Combustion TurbineGT102.6102.6Jun 1979Operating—coming soon
9Natural Gas Fired Combined CycleCT60.450Feb 2017Operating (Standby / backup)—coming soon
GT8Natural Gas Fired Combustion TurbineGT92.677.7Dec 1984Operating (Standby / backup)—coming soon
5Natural Gas Fired Combined CycleCT38.133.8Jan 1975Retired Dec 2016—coming soon
6Natural Gas Fired Combined CycleCA3334Mar 1979Retired Dec 2016—coming soon

Owner / operator

Operator: Chugach Electric Assn Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Chugach Electric Assn Inc100.0%347 MW

Nearby plants

Within 80 km.
Anchorage 178 MW8 km
JBER Landfill Gas Power Plant12 MW8.5 km
Southcentral Power Project204 MW12.2 km
Internationalretired12.4 km
International Battery Substation (IBSS)40 MW12.4 km
Fire Island Wind18 MW30.3 km