← Back to map

Bell Ridge Solar

Gilchrist County, Florida · EIA plant ID 65519 · Operator: bell ridge solar, llc
SolarSolar PhotovoltaicBA: SEC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation186GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202728.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202360.427.7%—
2024189.529.0%—
2025195.730.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRSSolar PhotovoltaicPV74.574.5Sep 2023Operating—coming soon

Owner / operator

Operator: bell ridge solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
bell ridge solar, llc100.0%75 MW

Nearby plants

Within 80 km.
County Line Renewable Energy Center75 MW10.9 km
Gilchrist County Solar75 MW11.8 km
High Springs Solar Power Plant75 MW12.2 km
Trenton11 MW14.9 km
Trenton Solar Power Plant75 MW15.8 km
Columbia Solar Power Plant75 MW18.3 km