Revolution WindUnder construction

Washington County, Rhode Island · EIA plant ID 65500 · Operator: Orsted Wind Power North America LLC
WindISONEBA: ISNE

715 MW under construction (Offshore Wind Turbine), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 715 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
REVWDOffshore Wind TurbineWS715715planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Orsted Wind Power North America LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
South Fork Wind130 MW8.2 km
Sunrise Wind—19.6 km
Block Island Wind Farm30 MW37.4 km
Rangeley3 MW40.5 km
Block Island7 MW41.4 km
Westport (MA)3 MW43.1 km