Green Providence Wind II, LLC
Providence County, Rhode Island · EIA plant ID 65479 · Operator: green providence wind ii, llc
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor18%wind units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 0 | 0.0% | — |
| 2022 | 2.5 | 9.4% | — |
| 2023 | 3.1 | 11.8% | — |
| 2024 | 3.8 | 14.4% | — |
| 2025 | 4.6 | 17.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GPWII | Onshore Wind Turbine | WT | 3 | 3 | Dec 2021 | Operating | — | vensys VENSYS82 |
Owner / operator
Operator: green providence wind ii, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| green providence wind ii, llc | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Green Providence Wind I, LLC | 2 MW | 0.4 km |
| NBC Field's Point Wind Farm | 5 MW | 0.9 km |
| Rhode Island Hospital | 10 MW | 3.4 km |
| Manchester Street | 515 MW | 3.7 km |
| Forbes Street Solar | 3 MW | 4.1 km |
| Little Bay | 1 MW | 4.4 km |