Northern Cardinal Solar SCS IL 1, LLC

Champaign County, Illinois · EIA plant ID 65412 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate10MWSummer 10 MW
Generators1in service
Net generation19GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202621.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202117.622.0%—
202217.720.2%—
20231921.7%—
202416.719.1%—
202519.121.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
20213Solar PhotovoltaicPV1010Feb 2021Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%10 MW

Nearby plants

Within 80 km.
Phoenix Solar South Farms LLC Solar Farm5 MW1.3 km
TAC-Distributed Energy Resource Hybrid2 MW2.2 km
University of Illinois Abbott Power Plt80 MW3.9 km
Bonacci 1—7.1 km
Bonacci 2—7.1 km
Solar Star Urbana Landfill Central2 MW7.9 km