Flint Hills Resources Pine Bend, LLC
Dakota County, Minnesota · EIA plant ID 65405 · Operator: flint hills resources pine bend, llc
Nameplate118MWSummer 95 MW
Generators3in service
Net generation362GWh12 mo to Dec 2025
Capacity factor65%gas/coal/oil units, summer MW
Heat rate10,324Btu/kWhfossil units, electric fuel, HHV
First online2019Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 268.5 | 61.4% | 10,137 |
| 2023 | 246.4 | 56.4% | 10,333 |
| 2024 | 299 | 68.2% | 10,256 |
| 2025 | 361.6 | 65.2% | 10,324 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CTG | Natural Gas Fired Combined Cycle | CT | 60.5 | 39.6 | May 2019 | Operating | — | coming soon |
| SOLAR | Solar Photovoltaic | PV | 45 | 45 | Dec 2023 | Operating | — | coming soon |
| STG | Natural Gas Fired Combined Cycle | CA | 12.9 | 10.3 | May 2019 | Operating | — | coming soon |
Owner / operator
Operator: flint hills resources pine bend, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| flint hills resources pine bend, llc | 100.0% | 118 MW |
Nearby plants
Within 80 km.
| USS Hubers Solar LLC CSG | 1 MW | 8.2 km |
| Northfield Holdco CSG | 5 MW | 8.2 km |
| Randolph CSG PV1-5 | 5 MW | 9 km |
| Byllesby | 4 MW | 9.1 km |
| FastSun 2 CSG | 1 MW | 9.2 km |
| Union Garden | 1 MW | 9.2 km |