Shakes Solar
Dimmit County, Texas · EIA plant ID 65333 · Operator: Cypress Creek Renewables
Nameplate200MWSummer 200 MW
Generators1in service
Net generation381GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 123.6 | 12.0% | — |
| 2023 | 426.6 | 24.3% | — |
| 2024 | 393.6 | 22.4% | — |
| 2025 | 387.2 | 22.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 785 | Solar Photovoltaic | PV | 200 | 200 | Jun 2022 | Operating | — | coming soon |
Owner / operator
Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cypress Creek Renewables | 100.0% | 200 MW |
Nearby plants
Within 80 km.
| Regis Carrizo Springs | 10 MW | 11.4 km |
| Caterina | 10 MW | 13.3 km |
| Cotulla BESS 1 | 10 MW | 49.2 km |
| SunShiner ESS | — | 55.6 km |
| Bramble Energy Center | — | 57.2 km |
| Holcomb (TX) | 10 MW | 59.5 km |