← Back to map

ENGIE Solidago Solar Project - Hybrid

New Castle County, Delaware · EIA plant ID 65304 · Operator: engie solidago solar llc
SolarSolar PhotovoltaicPJMBA: PJM

13 MW planned (Batteries), first expected Jun 2027 · EIA-860M

Nameplate50MWSummer 50 MW
Generators1in service
Net generation101GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202723.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.92.4%—
20239321.2%—
20249722.1%—
202597.522.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SOLARSolar PhotovoltaicPV5050Dec 2022Operating—coming soon
BESSBatteriesBA12.512.5planned Jun 2027Planned—coming soon

Owner / operator

Operator: engie solidago solar llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
engie solidago solar llc100.0%50 MW

Nearby plants

Within 80 km.
Maryland Line Road Solar—2.7 km
Grears Corner Solar—4.4 km
Blue Star8 MW9.7 km
Cedar Creek Solar—16.4 km
Warren F Sam Beasley Generation Station96 MW17 km
DG AMP Solar Smyrna1 MW17.1 km