← Back to map

Noble Solar

Denton County, Texas · EIA plant ID 65271 · Operator: Geronimo Energy
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate400MWSummer 400 MW
Generators2in service
Net generation484GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202720.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022122.115.4%—
2023579.624.2%—
2024583.524.2%—
2025528.122.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NBSLRSolar PhotovoltaicPV275275Sep 2022Operating—coming soon
NBSTGBatteriesBA125125Oct 2022Operating—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geronimo Energy100.0%400 MW

Nearby plants

Within 80 km.
Denton Energy Center226 MW5.8 km
TX10 Hummingbird Storage100 MW10.1 km
BKV-BPP Ponder Solar3 MW11.9 km
Porter Solar, LLC (TX)245 MW13.4 km
Spencer127 MW14.2 km
Denton Power LLCretired16.9 km