Venture 3 - 1C
Adams County, Colorado · EIA plant ID 65236 · Operator: uxi csg venture 3 8303 llc
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 0.5 | 10.4% | — |
| 2022 | 3.6 | 27.6% | — |
| 2023 | 3.8 | 29.2% | — |
| 2024 | 3.7 | 27.9% | — |
| 2025 | 3.5 | 26.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 75021 | Solar Photovoltaic | PV | 1.5 | 1.5 | Sep 2021 | Operating | — | coming soon |
Owner / operator
Operator: uxi csg venture 3 8303 llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| uxi csg venture 3 8303 llc | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Venture 1 - 1A CSG | 2 MW | 0.2 km |
| Venture 4 - 1D | 2 MW | 0.2 km |
| Pivot Solar 43 LLC | — | 0.2 km |
| Pivot Solar 53 LLC | — | 0.2 km |
| Venture 2 - 1B | 2 MW | 0.3 km |
| Blue Spruce Energy Center | 398 MW | 1.2 km |