Red Prairie Solar
Yamhill County, Oregon · EIA plant ID 65228 · Operator: tls capital, inc
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 0.5 | 5.8% | — |
| 2022 | 4.2 | 21.7% | — |
| 2023 | 4 | 20.7% | — |
| 2024 | 4.1 | 21.3% | — |
| 2025 | 4 | 20.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RP21 | Solar Photovoltaic | PV | 2.2 | 2.2 | Aug 2021 | Operating | — | coming soon |
Owner / operator
Operator: tls capital, inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Red Prairie Solar, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| SulusSolar33 | 3 MW | 1.6 km |
| Butler Solar, LLC | 4 MW | 1.7 km |
| Sheridan Solar LLC (CSG) | 3 MW | 1.7 km |
| Ballston Solar LLC | 2 MW | 2.1 km |
| Steel Bridge Solar, LLC | 2 MW | 4.7 km |
| Apricus Solar LLC | 3 MW | 7.1 km |