Apple Grove Solar, LLC
Louisa County, Virginia · EIA plant ID 65224 · Operator: apple grove solar, llc
Nameplate19MWSummer 19 MW
Generators1in service
Net generation30GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0.2 | 1.2% | — |
| 2024 | 30.1 | 18.4% | — |
| 2025 | 29.8 | 18.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ENX15 | Solar Photovoltaic | PV | 18.6 | 18.6 | Dec 2023 | Operating | — | coming soon |
Owner / operator
Operator: apple grove solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| apple grove solar, llc | 100.0% | 19 MW |
Nearby plants
Within 80 km.
| Horsepen Branch Solar | — | 7.7 km |
| Two Oaks Solar and Storage LLC | — | 12 km |
| Energix Aditya, LLC | 12 MW | 13.5 km |
| Whitehouse Solar Farm | 20 MW | 15 km |
| North Anna | 1,960 MW | 16.9 km |
| Martin Solar Center | 5 MW | 17 km |