← Back to map

Ridgeback

Randolph County, North Carolina · EIA plant ID 65110 · Operator: ridgeback solar, llc
SolarSolar PhotovoltaicBA: CPLE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202619.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202100.2%—
20223.620.7%—
20234.123.5%—
20243.922.1%—
20253.519.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RIDSolar PhotovoltaicPV22Dec 2021Operating—coming soon

Owner / operator

Operator: ridgeback solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
ridgeback solar, llc100.0%2 MW

Nearby plants

Within 80 km.
Henry Farm5 MW0.7 km
Kendall Farm5 MW2.8 km
Charlie4 MW12.5 km
Beth5 MW12.7 km
Snow Camp Solar, LLC5 MW14.1 km
Nick Solar5 MW14.3 km