← Back to map

Berrenda Mesa Water District

Kern County, California · EIA plant ID 65073 · Operator: The Greater Light USA LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate6MWSummer 6 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202625.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202416.529.3%—
202514.125.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV6.46.4Jul 2023Operating (Out of service, expected back within the year)—coming soon

Owner / operator

Operator: The Greater Light USA LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
The Greater Light USA LLC100.0%6 MW

Nearby plants

Within 80 km.
Lost Hills/Blackwell32 MW1.7 km
Blackwell?s Corner Storage Facility2 MW2.4 km
Blackwell Solar Park20 MW2.5 km
Lost Hills Oilfield2 MW4.3 km
Roll Lost Hillsretired4.9 km
Wonderful Lost Hills17 MW6.3 km