Linton
Greene County, Indiana · EIA plant ID 65069 · Operator: Indiana Municipal Power Agency
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 4.5 | 18.7% | — |
| 2023 | 10.6 | 22.4% | — |
| 2024 | 10.5 | 22.2% | — |
| 2025 | 9.7 | 20.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LINT | Solar Photovoltaic | PV | 5.4 | 5.4 | Jul 2022 | Operating | — | coming soon |
Owner / operator
Operator: Indiana Municipal Power Agency. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Indiana Municipal Power Agency | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Worthington Generation LLC | 242 MW | 11.1 km |
| Scotland Solar RES | 1 MW | 22.1 km |
| Sullivan Solar, LLC | 5 MW | 25.9 km |
| Edwardsport | 813 MW | 28 km |
| Osprey Point RES | 13 MW | 32 km |
| Merom | 1,080 MW | 32.5 km |