← Back to map

Dry Bridge Storage

Chesterfield County, Virginia · EIA plant ID 65044 · Operator: Dominion Energy Inc
BatteryBatteriesPJMBA: PJM
Nameplate20MWSummer 20 MW
Generators1in service
Net generation-2GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-400-300-200-1000MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-3.5——
2025-1.7——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DBESBatteriesBA2020Nov 2023Operating—coming soon

Owner / operator

Operator: Dominion Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dominion Energy Inc100.0%20 MW

Nearby plants

Within 80 km.
Moseley Hermon Solar5 MW4.7 km
North Ridge Solar20 MW11.6 km
Scott Solar Farm57 MW20.8 km
Quillwort Solar18 MW21.4 km
Scott-II Solar LLC20 MW21.8 km
Rockville 1 & 2retired22.9 km