← Back to map

Keeversville Solar CSG

Will County, Illinois · EIA plant ID 64868 · Operator: Keeversville Solar Energy Center LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202620.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211.315.0%—
20223.419.5%—
20233.620.6%—
20243.318.5%—
20253.620.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KEEVSolar PhotovoltaicPV22Jul 2021Operating—coming soon

Owner / operator

Operator: Keeversville Solar Energy Center LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Keeversville Solar Energy Center LLC100.0%2 MW

Nearby plants

Within 80 km.
Braidwood Generation Station2,450 MW1.6 km
NL IL Braceville—3.9 km
Ahern Community Solar I, LLC2 MW7.9 km
Gillard—9.3 km
SV Gardner 1 (Lutz) CSG2 MW9.7 km
SV CSG Gardner 2 LLC2 MW10 km