← Back to map

Daggett 2

San Bernardino County, California · EIA plant ID 64851 · Operator: Daggett Solar Power 2 LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate313MWSummer 313 MW
Generators2in service
Net generation482GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202731.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202323.817.5%—
202452933.8%—
2025518.933.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DAGGBBatteriesBA131131Dec 2023Operating—coming soon
DAGGPSolar PhotovoltaicPV182182Dec 2023Operating—coming soon

Owner / operator

Operator: Daggett Solar Power 2 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Daggett Solar Power 2 LLC100.0%313 MW

Nearby plants

Within 80 km.
Daggett 3449 MW0 km
Daggett 1114 MW0 km
Sunray 314 MW2.5 km
Sunray 220 MW2.5 km
Minneola Solar—8 km
Newberry Solar 1 LLCretired15.7 km