Deschutes County, Oregon · EIA plant ID 6484 · Operator: PacifiCorp
Nameplate1MWSummer 1 MW
Generators3in service
Net generation1GWh12 mo to Dec 2025
Capacity factor9%hydro units, summer MW
Heat rate—thermal plants only
First online1913
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 3.7 | 41.9% | — |
| 2002 | 3.4 | 39.3% | — |
| 2003 | 3 | 34.8% | — |
| 2004 | 2.5 | 28.7% | — |
| 2005 | 1.8 | 21.1% | — |
| 2006 | 2 | 23.1% | — |
| 2007 | 2.9 | 32.7% | — |
| 2008 | 2.9 | 33.2% | — |
| 2009 | 3.2 | 36.2% | — |
| 2010 | 2.4 | 27.8% | — |
| 2011 | 2.1 | 24.1% | — |
| 2012 | 3.3 | 38.1% | — |
| 2013 | 1.9 | 22.0% | — |
| 2014 | 2.5 | 28.5% | — |
| 2015 | 2.4 | 27.4% | — |
| 2016 | 2 | 22.3% | — |
| 2017 | 2.3 | 26.2% | — |
| 2018 | 1.4 | 16.5% | — |
| 2019 | 1.6 | 17.8% | — |
| 2020 | 0.3 | 3.6% | — |
| 2021 | 0.6 | 7.3% | — |
| 2022 | 0 | 0.2% | — |
| 2023 | 0.1 | 0.9% | — |
| 2024 | 1.1 | 12.5% | — |
| 2025 | 0.8 | 9.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 0.2 | 0.2 | Jul 1913 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 0.3 | 0.3 | Jul 1916 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 0.6 | 0.5 | Jul 1917 | Operating | — | coming soon |
Owner / operator
Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PacifiCorp | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Siphon Power Project | 5 MW | 3.5 km |
| Bear Creek Solar Center | 10 MW | 6.1 km |
| NorWest Energy 2, LLC | 10 MW | 6.8 km |
| OSLH, LLC | 10 MW | 6.8 km |
| Juniper Ridge Hydroelectric Project | 5 MW | 9.6 km |
| Tumbleweed Solar, LLC | 10 MW | 15.8 km |