← Back to map

Arbor Hill Solar

Adair County, Iowa · EIA plant ID 64755 · Operator: MidAmerican Energy Co
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate25MWSummer 24 MW
Generators1in service
Net generation46GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202721.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202236.417.3%—
202344.421.1%—
202443.320.5%—
202545.121.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AHSSolar PhotovoltaicPV2524Jan 2022Operating—coming soon

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%25 MW

Nearby plants

Within 80 km.
Stuart (IA)3 MW6.1 km
Gilliam South4 MW6.3 km
Wind GEM2 MW6.4 km
Arbor Hill Wind Farm310 MW7 km
Wolverine2 MW17.2 km