Dorchester County, Maryland · EIA plant ID 64690 · Operator: Invenergy Services LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate20MWSummer 20 MW
Generators1in service
Net generation32GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20212022202320242025202618.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202125.528.9%—
202244.925.6%—
202343.524.8%—
202433.919.3%—
202531.518.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
65004Solar PhotovoltaicPV2020Jul 2021Operating—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invenergy Services LLC100.0%20 MW

Nearby plants

Within 80 km.
Richfield Solar Energy LLC50 MW2.9 km
Cabin Creek MD2 MW5.3 km
Federalsburg Energy Storage 1 LLC2 MW11.2 km
Vienna Operations181 MW14 km
Mountain Point- Sharptown2 MW17.4 km
CNE at Cambridge MD3 MW19.3 km