Bulldog Solar One, LLC

Prince Georges County, Maryland · EIA plant ID 64647 · Operator: Nautilus Solar Solutions
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202621.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20213.922.5%—
20223.721.2%—
20233.419.2%—
20243.721.3%—
20253.721.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
QABSolar PhotovoltaicPV22Nov 2020Operating—coming soon

Owner / operator

Operator: Nautilus Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nautilus Solar Solutions100.0%2 MW

Nearby plants

Within 80 km.
MD - CS - BGE - PR24 TPE2 MW1.4 km
City of Bowie2 MW1.4 km
MD - PR97 (CSG)2 MW2.6 km
Claggett Landing2 MW4 km
MDD109-NCBP BLDG 11-Manekin2 MW5.6 km
NCBP TWELVE, LLC1 MW5.8 km