TG East
Knox County, Texas · EIA plant ID 64639 · Operator: TG East Wind Project LLC
Nameplate336MWSummer 336 MW
Generators1in service
Net generation1,079GWh12 mo to Aug 2026
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 886.5 | 40.0% | — |
| 2023 | 1,043.4 | 35.4% | — |
| 2024 | 1,080.9 | 36.6% | — |
| 2025 | 980.8 | 33.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ESCA | Onshore Wind Turbine | WT | 336 | 336 | Apr 2022 | Operating | — | vestas V162-5.6 |
Owner / operator
Operator: TG East Wind Project LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| TG East Wind Project LLC | 100.0% | 336 MW |
Nearby plants
Within 80 km.
| El Campo Wind | 243 MW | 5.8 km |
| Montgomery Ranch Wind Farm, LLC | 203 MW | 10.6 km |
| Green Pastures Wind II | 150 MW | 16.6 km |
| Griffin Trail Wind | 226 MW | 17.1 km |
| Foard City Wind | 353 MW | 20 km |
| Green Pastures Wind I | 150 MW | 26.9 km |