← Back to map

OE_ALD

Covington County, Alabama · EIA plant ID 64469 · Operator: Origis Energy USA, Inc
SolarSolar PhotovoltaicBA: SOCO
Nameplate80MWSummer 80 MW
Generators1in service
Net generation172GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202724.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202316330.9%—
2024148.421.1%—
2025170.824.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OEALDSolar PhotovoltaicPV8080Apr 2023Operating—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Origis Energy USA, Inc100.0%80 MW

Nearby plants

Within 80 km.
Pecan Tree75 MW34.4 km
Wild Quail75 MW34.8 km
Swallowtail75 MW35.7 km
Chautauqua Solar Energy Center75 MW39.4 km
Point A5 MW39.9 km
Canoe149 MW40.6 km