JVR Energy Park LLCUnder construction
San Diego County, California · EIA plant ID 64428 · Operator: JVR Energy Park LLC
160 MW under construction (Batteries, Solar Photovoltaic), first expected Mar 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 160 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| JVR1A | Solar Photovoltaic | PV | 90 | 90 | planned Mar 2027 | Under construction | — | coming soon |
| JVR1B | Batteries | BA | 70 | 70 | planned Mar 2027 | Under construction | — | coming soon |
Owner / operator
Operator: JVR Energy Park LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Jacumba Solar Farm | 20 MW | 4.3 km |
| Boulevard Energy Storage | 10 MW | 10.1 km |
| Tule Wind LLC | 143 MW | 11.6 km |
| Kumeyaay Wind | 50 MW | 18 km |
| Ocotillo Express LLC | 265 MW | 18.6 km |
| Golden Acorn Casino | 1 MW | 18.8 km |