← Back to map

Copperton Solar Plant No. 1

Salt Lake County, Utah · EIA plant ID 64427 · Operator: Kennecott Utah Copper
SolarSolar PhotovoltaicBA: PACE
Nameplate30MWSummer 30 MW
Generators2in service
Net generation7GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20242025202611.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20240.69.1%—
20257.311.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSP1Solar PhotovoltaicPV54.9Nov 2024Operating—coming soon
CSP2Solar PhotovoltaicPV2524.7Dec 2025Operating—coming soon

Owner / operator

Operator: Kennecott Utah Copper. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Kennecott Utah Copper100.0%30 MW

Nearby plants

Within 80 km.
Trans-Jordan Generating Station5 MW3.5 km
eBay - South Jordanretired3.6 km
West Valley Generation Project217 MW11 km
Kennecott Power Plant38 MW15.4 km
Swire Coca-Cola Draper4 MW16.7 km