← Back to map

Gold Mine

Greenwood County, South Carolina · EIA plant ID 64412 · Operator: Gold Mine Solar, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202622.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202003.5%—
2021322.8%—
20223.324.9%—
20233.123.8%—
2024322.8%—
20252.922.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GMINESolar PhotovoltaicPV1.51.5Dec 2020Operating—coming soon

Owner / operator

Operator: Gold Mine Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Gold Mine Solar, LLC100.0%2 MW

Nearby plants

Within 80 km.
Augusta Solar2 MW10.5 km
Briarwood2 MW11.6 km
Woodfields Solar2 MW15.5 km
Richard B Russell628 MW34.4 km
Ware Shoals Hydro Project6 MW36.9 km
Rocky River (SC)4 MW40.8 km