Milligan 1 Wind Farm
Saline County, Nebraska · EIA plant ID 64377 · Operator: Milligan 1 Wind, LLC
Nameplate300MWSummer 300 MW
Generators3in service
Net generation982GWh12 mo to Aug 2026
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2020
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 40.4 | 32.9% | — |
| 2021 | 770.7 | 31.6% | — |
| 2022 | 1,130.5 | 43.0% | — |
| 2023 | 1,023.8 | 39.0% | — |
| 2024 | 1,054 | 40.0% | — |
| 2025 | 981.4 | 37.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SG275 | Onshore Wind Turbine | WT | 99 | 99 | Dec 2020 | Operating | — | siemens gamesa SWT-2.415-108 |
| SG4.5 | Onshore Wind Turbine | WT | 135 | 135 | Mar 2021 | Operating | — | siemens gamesa SG 4.5-145 |
| V110 | Onshore Wind Turbine | WT | 66 | 66 | Dec 2020 | Operating | — | vestas V110-2.0 |
Owner / operator
Operator: Milligan 1 Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Milligan 1 Wind, LLC | 100.0% | 300 MW |
Nearby plants
Within 80 km.
| Wilber | 4 MW | 22 km |
| Crete | 6 MW | 27.4 km |
| Crete Solar | 2 MW | 31.6 km |
| Hallam | 57 MW | 37.8 km |
| Sheldon | 229 MW | 37.9 km |
| Princeton Road Station | — | 38.1 km |