← Back to map

SCS American Bottoms 009885 Sauget, LLC

St. Clair County, Illinois · EIA plant ID 64362 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202612.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20200.710.4%—
20212.817.7%—
20222.818.0%—
2023319.0%—
20242.515.5%—
20251.912.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
30004Solar PhotovoltaicPV1.81.8Aug 2020Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%2 MW

Nearby plants

Within 80 km.
Anheuser-Busch St Louis26 MW2.5 km
Southwestern Bell Telephone17 MW4.1 km
Trigen St. Louis34 MW4.9 km
IKEA St. Louis 4101 MW7.2 km
Venice586 MW8.1 km
Renewable Energy Center at BJH2 MW8.2 km