Gorge

Whatcom County, Washington · EIA plant ID 6431 · Operator: City of Seattle - (WA)
HydroConventional HydroelectricBA: SCL
Nameplate207MWSummer 193 MW
Generators4in service
Net generation942GWh12 mo to Aug 2026
Capacity factor56%hydro units, summer MW
Heat rate—thermal plants only
First online1924

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202555.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001586.237.9%—
20021,023.666.2%—
2003929.360.1%—
2004922.559.5%—
2005775.751.3%—
2006870.557.5%—
20071,075.171.1%—
2008915.456.6%—
2009838.952.0%—
2010870.456.5%—
20111,093.270.9%—
20121,080.169.9%—
2013954.261.9%—
20141,056.768.5%—
2015952.661.8%—
20161,035.567.0%—
2017997.664.7%—
201894656.0%—
2019831.849.2%—
2020957.256.5%—
2021987.758.4%—
2022988.758.5%—
2023725.542.9%—
202468940.6%—
202576945.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
21Conventional HydroelectricHY36.832Sep 1924Operating—coming soon
22Conventional HydroelectricHY36.832Sep 1924Operating—coming soon
23Conventional HydroelectricHY36.832May 1929Operating—coming soon
24Conventional HydroelectricHY96.997Jun 1951Operating—coming soon

Owner / operator

Operator: City of Seattle - (WA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Seattle - (WA)100.0%207 MW

Nearby plants

Within 80 km.
Newhalem2 MW3.4 km
Diablo182 MW5.9 km
Ross450 MW11 km
Upper Baker105 MW35.8 km
Koma Kulshan Associates12 MW37.8 km
Lower Baker104 MW42.5 km