Meriwether Jackson

Meriwether County, Georgia · EIA plant ID 64280 · Operator: Safari Energy, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202619.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20205.125.6%—
20216.323.9%—
20226.223.6%—
20235.922.4%—
20246.323.9%—
20255.219.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MJSolar PhotovoltaicPV33Apr 2020Operating—coming soon

Owner / operator

Operator: Safari Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Meriwether County GA S1, LLC100.0%3 MW

Nearby plants

Within 80 km.
Mossy Branch Battery Facility65 MW8.4 km
Harris Shiloh2 MW10.1 km
Camp Solar Plant2 MW13.5 km
Troup RC502 MW19.3 km
Greenville1 MW19.8 km
Troup RC50 II2 MW23.6 km