← Back to map

Dressor Plains Solar, LLC

Fayette County, Illinois · EIA plant ID 64224 · Operator: Dressor Plains Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate99MWSummer 99 MW
Generators1in service
Net generation221GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202725.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20217224.8%—
2022233.927.0%—
2023233.626.9%—
2024226.726.1%—
2025232.126.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DPSSolar PhotovoltaicPV9999Sep 2021Operating—coming soon

Owner / operator

Operator: Dressor Plains Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dressor Plains Solar, LLC100.0%99 MW

Nearby plants

Within 80 km.
Switchgrass Plains Solar, LLC—2.8 km
Freedom Power Projectretired17.5 km
Holland Energy Facility702 MW23.9 km
SV CSG Brownstown 1—23.9 km
Conagra Foods at St. Elmo2 MW25.3 km
North Pana—25.3 km