REG Juhl Glenville Wind, LLC
Freeborn County, Minnesota · EIA plant ID 64130 · Operator: REG Juhl Glenville Wind, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 0.2 | 9.3% | — |
| 2021 | 8.1 | 36.9% | — |
| 2022 | 10.3 | 46.9% | — |
| 2023 | 8.5 | 38.6% | — |
| 2024 | 9.4 | 43.0% | — |
| 2025 | 7.6 | 34.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RJGW | Onshore Wind Turbine | WT | 2.5 | 2.5 | Dec 2020 | Operating | — | ge 2.5-116 |
Owner / operator
Operator: REG Juhl Glenville Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| REG Juhl Glenville Wind, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Goose Lake MN DPC-GM | 2 MW | 9.6 km |
| Freeborn Wind Farm | 218 MW | 12.1 km |
| Bancroft (MN) | 3 MW | 13.7 km |
| Bent Tree Wind Farm Phase 1 | 201 MW | 19.7 km |
| Windwalkers LLC | 2 MW | 23 km |
| Top of Iowa Windfarm | 80 MW | 23.9 km |