Great Lakes Seaway Community Solar
Jefferson County, New York · EIA plant ID 64092 · Operator: OYA Great Lakes Seaway LLC
Nameplate10MWSummer 10 MW
Generators2in service
Net generation5GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 3.6 | — | — |
| 2021 | 7.8 | — | — |
| 2022 | 7.8 | — | — |
| 2023 | 7.8 | — | — |
| 2024 | 7.9 | — | — |
| 2025 | 5.2 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GLSCS | Solar Photovoltaic | PV | 5 | 5 | Dec 2019 | Operating | — | coming soon |
| GLSS | Batteries | BA | 5 | 5 | Dec 2019 | Operating | — | coming soon |
Owner / operator
Operator: OYA Great Lakes Seaway LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| OYA Great Lakes Seaway LLC | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| NYS Rte 12 Community Solar | 10 MW | 0 km |
| Blanchard Road 1 Community Solar | 10 MW | 0 km |
| Blanchard Road 2 Community Solar | 10 MW | 0 km |
| OYA Robinson Road | 5 MW | 1.9 km |
| Tracy Solar Energy Center | — | 9 km |
| ASA Clayton NY Solar I LLC | 1 MW | 12.9 km |