Brick Church Solar

Rensselaer County, New York · EIA plant ID 64017 · Operator: Brick Church Solar 1, LLC
SolarSolar PhotovoltaicNYISOBA: NYIS
Nameplate4MWSummer 4 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202020212022202320242025202617.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20206.518.6%—
2021617.3%—
20226.618.7%—
20236.217.7%—
20246.518.4%—
20256.217.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7405Solar PhotovoltaicPV44Sep 2019Operating—coming soon

Owner / operator

Operator: Brick Church Solar 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Brick Church Solar 1, LLC100.0%4 MW

Nearby plants

Within 80 km.
Hope Solar Farm LLC2 MW3.7 km
Dusenberry5 MW3.9 km
Belair4 MW5.4 km
North Troy4 MW6.4 km
Green Island Hydroelectric Station6 MW9 km
Mt Ida Hydroelectric3 MW9.1 km