Toyota Long Beach Trigen
Los Angeles County, California · EIA plant ID 64005 · Operator: Long Beach Trigen, LLC
Nameplate3MWSummer 2 MW
Generators1in service
Net generation13GWh12 mo to Dec 2025
Capacity factor69%other units, summer MW
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 5.1 | 157.3% | — |
| 2024 | 16.8 | 86.9% | — |
| 2025 | 13.4 | 69.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MMR-1 | Other Waste Biomass | FC | 2.8 | 2.2 | Nov 2023 | Operating | — | coming soon |
Owner / operator
Operator: Long Beach Trigen, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Long Beach Trigen, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Tesoro Wilmington Calciner | retired | 0.7 km |
| Harbor Cogen | 107 MW | 0.8 km |
| Linde Wilmington | 31 MW | 1.1 km |
| Valero Wilmington Cogeneration Plant | 34 MW | 1.5 km |
| THUMS | 57 MW | 1.6 km |
| Wilmington Hydrogen Plant | 32 MW | 1.6 km |