← Back to map

Micanopy Energy Storage Facility

Alachua County, Florida · EIA plant ID 63999 · Operator: Duke Energy Florida, Inc
BatteryBatteriesBA: FPC
Nameplate8MWSummer 8 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-25-20-15-10-50MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-0.2——
2025-0.2——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ES1BatteriesBA8.38.3Oct 2022Operating—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Florida, Inc100.0%8 MW

Nearby plants

Within 80 km.
South Energy Center12 MW15.5 km
John R Kelly142 MW15.6 km
Whistling Duck I75 MW15.7 km
University of Florida54 MW16 km
Butler Plaza1 MW16.1 km
MLH 21 MW21.5 km