← Back to map

SSD Clackamas 4, LLC

Clackamas County, Oregon · EIA plant ID 63962 · Operator: Thor Solar 1 CEI, LLC
SolarSolar PhotovoltaicBA: PGE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202624.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202003.3%—
20213.620.8%—
20223.922.1%—
20234.123.3%—
20244.223.8%—
20254.224.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV22Dec 2020Operating—coming soon

Owner / operator

Operator: Thor Solar 1 CEI, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Thor Solar 1 CEI, LLC100.0%2 MW

Nearby plants

Within 80 km.
OR - Green Key - Marquam2 MW2.2 km
Rodeo Solar LLC (OR)2 MW2.5 km
SulusSolar353 MW4.4 km
Thomas Creek Solar2 MW4.7 km
Mt Hope Solar3 MW4.8 km
Kaiser Creek Solar (CSG)2 MW6.2 km