← Back to map

Mendota

LaSalle County, Illinois · EIA plant ID 63954 · Operator: Mendota US Solar 1 LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202618.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202000.0%—
2021317.2%—
20223.419.3%—
20232.916.8%—
20243.419.4%—
20253.318.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MENDSSolar PhotovoltaicPV22Dec 2020Operating—coming soon

Owner / operator

Operator: Mendota US Solar 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Mendota US Solar 1 LLC100.0%2 MW

Nearby plants

Within 80 km.
Mendota Rich Dev CSG2 MW1.3 km
GSG LLC80 MW10.6 km
Cherry Solar 1—12.2 km
Com Adam 1WF-15 MW14.5 km
South Cherry Solar 1—15.3 km
Arlington 2—15.4 km