Lily Solar Hybrid
Kaufman County, Texas · EIA plant ID 63892 · Operator: Lily Solar, LLC
Nameplate202MWSummer 196 MW
Generators2in service
Net generation319GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 194.4 | 60.2% | — |
| 2022 | 368.1 | 28.8% | — |
| 2023 | 335.3 | 26.2% | — |
| 2024 | 308.8 | 24.3% | — |
| 2025 | 318.4 | 25.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LILY | Solar Photovoltaic | PV | 146.7 | 146 | Oct 2021 | Operating | — | coming soon |
| LILYB | Batteries | BA | 55.2 | 50 | Oct 2021 | Operating | — | coming soon |
Owner / operator
Operator: Lily Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Lily Solar, LLC | 100.0% | 202 MW |
Nearby plants
Within 80 km.
| Anole Energy Storage | 240 MW | 10.6 km |
| Kaufman Solar | 200 MW | 19.5 km |
| Ameresco Dallas LLC | 4 MW | 23.9 km |
| Forney Energy Center | 1,894 MW | 25.5 km |
| Wensowitch Solar Park | — | 26.5 km |
| TX Sunnyvale 367 Long Creek Road Solar | 2 MW | 29.8 km |