← Back to map

CED Beecher Sun Solar

Will County, Illinois · EIA plant ID 63823 · Operator: bay4 energy services, llc
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202623.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20223.922.5%—
20233.520.0%—
2024422.6%—
20254.123.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BS1Solar PhotovoltaicPV22May 2021Operating—coming soon

Owner / operator

Operator: bay4 energy services, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
bay4 energy services, llc100.0%2 MW

Nearby plants

Within 80 km.
Cottage Grove North Solar 1, LLC2 MW2.6 km
Cottage Grove South Solar 1, LLC2 MW3.4 km
Beecher (IL)5 MW6.2 km
Beecher Gas Recovery3 MW6.4 km
Goodenow Road West Solar 1, LLC2 MW6.9 km
Woodlawn II (CSG)2 MW7.4 km