← Back to map

Gunsight Solar, LLC

Lexington County, South Carolina · EIA plant ID 63813 · Operator: Gunsight Solar, LLC
SolarSolar PhotovoltaicBA: SC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation173GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202726.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202200.0%—
2023157.123.9%—
2024166.125.2%—
2025173.526.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PGR26Solar PhotovoltaicPV7575Dec 2022Operating—coming soon

Owner / operator

Operator: Gunsight Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Gunsight Solar, LLC100.0%75 MW

Nearby plants

Within 80 km.
Gaston Solar I - SC10 MW4.3 km
Gaston II8 MW4.5 km
Columbia Energy Center (SC)669 MW12.9 km
Midlands72 MW16.9 km
Swamp Fox Solar11 MW17.8 km
Champion Solar11 MW18.5 km