Ben Moreell Solar Farm
Monmouth County, New Jersey · EIA plant ID 63786 · Operator: GSRP
Nameplate20MWSummer 20 MW
Generators1in service
Net generation35GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 35.8 | 20.4% | — |
| 2021 | 38.6 | 22.0% | — |
| 2022 | 35.4 | 20.2% | — |
| 2023 | 34.5 | 19.7% | — |
| 2024 | 36.2 | 20.6% | — |
| 2025 | 34.6 | 19.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BMSF | Solar Photovoltaic | PV | 20 | 20 | Jan 2020 | Operating | — | coming soon |
Owner / operator
Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Ben Moreell Solar Farm, LLC | 100.0% | 20 MW |
Nearby plants
Within 80 km.
| Tinton Falls Solar Farm | 16 MW | 2.2 km |
| Seabrook Village | 3 MW | 5.2 km |
| Brookdale CC BTM at Lincroft | 4 MW | 5.8 km |
| Cornerstone Power Holmdel LLC | 3 MW | 10.9 km |
| Brickyard Solar | 2 MW | 11.1 km |
| Rock Solid | 8 MW | 12.1 km |