Nameplate4MWSummer 4 MW
Generators2in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate29,643Btu/kWhfossil units, electric fuel, HHV
First online1991Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2004 | -0 | -0.1% | — |
| 2005 | 0.3 | 1.1% | 19,196 |
| 2006 | 0.2 | 0.7% | 22,871 |
| 2007 | 0.3 | 1.2% | 17,138 |
| 2008 | 0 | 0.1% | — |
| 2009 | -0.1 | -0.3% | — |
| 2010 | 0.2 | 0.8% | 17,329 |
| 2011 | 0.2 | 0.6% | 20,961 |
| 2012 | -0 | -0.1% | — |
| 2013 | 0 | 0.1% | — |
| 2014 | 0.1 | 0.4% | 24,192 |
| 2015 | 0.1 | 0.3% | 28,403 |
| 2016 | -0.1 | -0.2% | — |
| 2017 | 0.1 | 0.5% | — |
| 2018 | 0.1 | 0.5% | 10,127 |
| 2019 | 0.1 | 0.5% | 17,191 |
| 2020 | -0 | -0.1% | — |
| 2021 | -0 | -0.1% | — |
| 2022 | 0.1 | 0.6% | 16,399 |
| 2023 | -0.1 | -0.3% | — |
| 2024 | -0.2 | -0.3% | — |
| 2025 | -0.1 | 0.2% | 29,643 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 3 | 3 | Apr 1991 | Operating | — | coming soon |
| BAT | Batteries | BA | 1 | 1 | Jan 2017 | Operating | — | coming soon |
Owner / operator
Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| North Carolina El Member Corp | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Buxton | 15 MW | 44.1 km |
| Bayboro Solar Farm | 5 MW | 75.7 km |
| Coogee Solar | 5 MW | 76.9 km |
| Rose Acre Solar Energy Storage | 5 MW | 77.4 km |
| PCS Phosphate | 54 MW | 78.5 km |