Nameplate15MWSummer 15 MW
Generators1in service
Net generation28GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 14.3 | 18.6% | — |
| 2021 | 32.6 | 24.8% | — |
| 2022 | 27.4 | 20.8% | — |
| 2023 | 20.7 | 15.8% | — |
| 2024 | 24.7 | 18.7% | — |
| 2025 | 28.3 | 21.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MYSO | Solar Photovoltaic | PV | 15 | 15 | Jun 2020 | Operating | — | coming soon |
Owner / operator
Operator: Dominion Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dominion Energy Inc | 100.0% | 15 MW |
Nearby plants
Within 80 km.
| Nuby Run Solar, LLC | 2 MW | 10.7 km |
| Prairie Solar (VA) | 20 MW | 11.4 km |
| Solidago Solar | 20 MW | 11.7 km |
| Woodland Solar Farm | 19 MW | 12.3 km |
| Pleasant Hill Solar | 20 MW | 13.6 km |
| Suffolk CSG, LLC | 4 MW | 14.3 km |