← Back to map

Greensville County Solar Project, LLC

Greensville County, Virginia · EIA plant ID 63745 · Operator: Dominion Energy Inc
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate80MWSummer 80 MW
Generators1in service
Net generation152GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202721.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20204.98.3%—
2021154.722.1%—
2022141.220.2%—
2023129.318.4%—
2024135.519.3%—
2025138.919.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GVSOSolar PhotovoltaicPV8080Dec 2020Operating—coming soon

Owner / operator

Operator: Dominion Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dominion Energy Inc100.0%80 MW

Nearby plants

Within 80 km.
Sadler Solar100 MW5.3 km
Emporia3 MW6.3 km
Meherrin Solar60 MW9 km
Fountain Creek Solar80 MW10.5 km
Greensville County Power Station1,773 MW11.2 km
Pleasant Hill PV120 MW12.2 km