Golden Hill Wind

Sherman County, Oregon · EIA plant ID 63710 · Operator: Avangrid Renewables Inc
WindOnshore Wind TurbineBA: AVRN
Nameplate201MWSummer 201 MW
Generators1in service
Net generation608GWh12 mo to Aug 2026
Capacity factor34%wind units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20222023202420252026202734.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022409.630.8%—
202359733.9%—
2024620.835.1%—
2025610.934.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GH1Onshore Wind TurbineWT201.3201.3Apr 2022Operating—vestas V150-4.2

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Avangrid Renewables Inc100.0%201 MW

Nearby plants

Within 80 km.
Biglow Solar Generation and BESS—8.1 km
WyEast Solar10 MW8.8 km
Klondike Windpower II75 MW9 km
PaTu Wind Farm LLC9 MW9.1 km
Hay Canyon Wind Power LLC101 MW11.5 km
Klondike Wind Power25 MW12.3 km